Option to prevent processing a Move Qty for more than Previous Operation

It would be helpful to have an option on the Production Order type to prevent moving more on a subsequent operation than was completed on the previous operation.

One example of where this would be helpful is in the use of attributes on a Production Order. Currently if there is a required attribute on operation 0010 and you only record a move on operation 0020 the attribute is no longer required and is saved with no value.

If we could have an option to limit the qty's completed on operation to the qty completed on the previous operation this could be enforced and entered by the appropriate personnel.